Getting your home and yard ready for a new roof

Preparation is mostly about clearing access, protecting what is under and around the roof, and sorting out the paperwork and people before the crew turns up.

Two workers in safety harnesses on a shingle house roof

Key points

  • Start with the paperwork: scope, approvals check, solar and payment terms.
  • Clear the driveway, side paths and eaves for scaffold and deliveries.
  • Protect the ceiling space and rooms below from dust and vibration.
  • Plan for pets, children, neighbours and working from home.

A little preparation makes a roof replacement noticeably smoother for everyone. This checklist is for Adelaide homeowners who have chosen a contractor and have a start date coming up, and it covers the house, the yard, the people and the paperwork. Most of it takes an afternoon; a few items need booking a week or two ahead.

If you are still choosing who to hire, start with questions to ask a roof replacement contractor and come back here once you have signed.

Two to four weeks out: paperwork and bookings

Confirm the written scope

Read the contract one more time. It should name the material, profile and colour, and say what happens with sarking, battens, flashings, gutters, solar and waste. It should also explain how variations are priced and approved. If anything is vague, ask now rather than on the roof.

Check approvals

Like-for-like re-roofing often needs no development approval in South Australia, but heritage places and areas, a change in roof form or structural work may. Applications go through the PlanSA portal, so check with your council before work starts. If you live in the Adelaide Hills or the foothills, ask whether a bushfire hazard overlay applies, as the Code can bring AS 3959 construction requirements.

Sort out asbestos questions early

Many post-war Adelaide homes, older extensions, eaves, sheds and garages contain asbestos cement sheet, sometimes in the Super Six profile. If any part of your roof might be asbestos, have it assessed before the start date. SafeWork SA sets out when a licensed removalist is required, so check with them, and disposal must go to an EPA-licensed facility. Do not cut, drill, water-blast or walk on it yourself. Our guide on how to tell if your roof is asbestos can help.

Book the solar electrician

If you have panels, confirm who is organising disconnection, removal and reinstatement, and lock in dates that line up with the roofing schedule.

Talk to insurers if relevant

If the re-roof follows storm damage, check where your claim is up to before work starts. Our insurance roof replacement page outlines the usual steps.

The week before: outside the house

Crews need space to work safely and move material on and off the roof.

  • Driveway. Clear it for a skip bin and deliveries. Plan to park on the street.
  • Side paths and eaves. Move bins, bikes, pot plants, outdoor furniture and barbecues away from the walls, because scaffold goes there and debris can fall.
  • Garden beds. Cover delicate plants near the house with shade cloth or old sheets. Tell the crew about any irrigation lines or garden lights close to the walls.
  • Trees. Trim branches overhanging the roof, as they get in the way of scaffold and sheet handling.
  • Power lines. Let the contractor know if the service line to the house runs low over the roof or driveway.
  • Pools. Cover them if they sit near the roof line; grit and fixings travel.
  • Access. Make sure side gates can be opened and tell the crew about any gate codes or locks.

The week before: inside the house

Most of the inside preparation is about dust and vibration.

Area What to do Why
Roof space Remove stored boxes and valuables Dust, debris and crew access
Rooms with downlights Cover furniture and beds with sheets Fine dust drifts through fittings
Walls Take down mirrors, frames and shelf items Hammering causes vibration
Manhole Make sure the cover sits tightly Keeps dust out of living areas
Electronics Cover computers and TVs in top-floor rooms Grit gets into vents
Attic ladders and fans Note any you rely on The crew may need them switched off

Ducted air-conditioning units in the roof space are worth mentioning to the contractor too, as ducts and the unit may need protecting and the system may be off for a time.

People and pets

Stripping day is loud. If you work from home, plan to be somewhere else or at least in the quietest room. Babies, shift workers and anyone sensitive to dust may prefer a day or two away around the start of the job.

Pets often get stressed by noise and strangers at the gate. Dogs may be safer at a relative's place or in day care for the noisiest days, and cats are best kept inside and away from open doors. Keep children well away from scaffold, skips and the drip line of the roof.

Let your neighbours know the dates, the likely noise and where the skip and trucks will be. A short note in the letterbox prevents most complaints.

Weather and timing

Adelaide's wet months run roughly May to September, and spring storms can bring hail and strong wind. Crews will stop when it is unsafe, so treat the start date as a target rather than a fixed point. Our article on the best time of year for a roof replacement and the timeline guide help you set expectations.

If you are going from tile to steel

Changing roof material brings a couple of extra things to think about. A switch from concrete or terracotta tiles to Colorbond steel means new battens at different spacings, different flashings and often new gutters, so the scope will be wider than a like-for-like job. It also changes how the house sounds in heavy rain and how heat moves through the roof, which is why many people use the opportunity to add an insulation blanket or upgrade ceiling insulation while the roof is open. Read our guide to Colorbond versus tile if you are still weighing it up, and confirm your colour choice early so the order is not held up.

Any change of roof material or colour in a heritage area may also need approval, so include it in your council check.

If the house will be empty

Some owners re-roof a rental between tenants, or a home they are about to move into. That can make the job easier, but someone still needs to be reachable during the day for decisions about hidden damage and variations. Arrange a key handover, leave the power and water connected, and make sure the crew knows who to call. Tenants who are still in the house should get written notice of the dates and a copy of this checklist.

Money and paperwork

Before the start date, confirm the deposit has been paid as agreed and that you understand when later payments fall due. Keep a folder, paper or digital, for the contract, any variation approvals, photos and final documents. Taking your own photos of ceilings, walls and paths before work starts is useful if a question comes up later. For what tends to change the overall figure, see the roof replacement cost guide.

On the morning

Unlock gates, move the last car, put the pets away and introduce yourself to the crew leader. Confirm the toilet arrangement, the power point they can use and the best number to reach you. Then let them get on with it. If you have questions about the job or need a local contractor, contact us.

Next step. Prices for Adelaide roofs are on the roof replacement cost guide, and the matching service is Metal roof replacement. To have a contractor look at your roof, call 08 7100 9699.

General information about roofs in and around Adelaide. It does not replace an inspection of your roof, and rules change: confirm anything regulatory with the council or agency named.

FAQs

Questions people ask before they commit

Should I clear out the roof space before a re-roof?

If you store things up there, yes. Boxes and stored items will collect dust and debris, and the crew may need clear access to the frame. Move anything valuable or fragile down and cover what cannot be moved.

Do I need to tell my neighbours?

It is not usually a legal requirement, but it helps. Let them know the dates, that there will be noise, trucks and possibly a skip on the verge, and whether scaffold will sit near the boundary.

What do I need to do about solar panels?

Confirm who is arranging the electrician to safely disconnect, remove, store and reinstall them. Expect the system to be off for part of the job, and ask whether the panels and mounts will be inspected before going back up.

Can I leave my car in the garage?

You can, but you may not be able to get it out while a skip or delivery blocks the driveway. Most people park on the street for the duration, and carports under the roof line are best emptied.

Do I need council approval?

Like-for-like re-roofing often needs none, but heritage places and areas, a change to the roof shape or structural work may. Applications go through the PlanSA portal, so check with your council before work starts.

Free, no-obligation

Get your free quote today

Describe the roof and we will line up an inspection

Roof Replacements Adelaide Call 08 7100 9699 Book a free roof inspection
Call 08 7100 9699