Adelaide metro & HillsRing 08 7100 9699
ROORoof Replacements Adelaide

Five common re-roofing errors and how Adelaide owners can sidestep them

Adelaide · reviewed 2026-10-06 · about 7 minutes

Most re-roofing regrets come from decisions made before the crew arrives: unclear quotes, unchecked credentials, and skipped questions about what sits under the old roof.

Worker standing on the ridge of a gable roof with scaffold and trees behind

Key points

  • Compare quotes line by line, not just on the total.
  • Check the contractor's licence on the CBS public register before signing.
  • Ask what happens to battens, sarking, insulation and gutters.
  • Sort out asbestos, approvals and solar before the start date.

Most problems with a new roof can be traced back to choices made before the old one came off. Rushing to the cheapest quote, skipping credential checks, or not asking what will happen under the roofing are the usual culprits. If you own a home in Adelaide and a re-roof is coming up, the five mistakes below are worth knowing about, along with the simple steps that avoid each one.

Mistake 1: Comparing quotes on the total alone

Two roof replacement quotes can look very different on the bottom line and still not describe the same job. One may include new battens, sarking and gutters; another may assume the old ones are reused. One may cover removal of solar panels; another may leave that for you to arrange. Picking the lower figure without checking what is in it often leads to variations later.

How to avoid it: ask every contractor to quote on the same scope, and read each line. Use a simple checklist:

Item What to confirm
Roofing product Brand range, profile and colour named in writing
Battens and framing Whether they are checked, replaced or reused, and how repairs are priced
Sarking and insulation Whether new sarking or a blanket is included
Gutters, downpipes, flashings Replaced, reused or excluded
Old roof removal Disposal included, and any asbestos handled separately
Access and safety Scaffolding and edge protection covered
Variations How unexpected work is identified, approved and charged

Our roof replacement cost guide explains why these items move the price, without guessing at figures for your house.

Mistake 2: Not checking who is doing the work

A roof is a large, high-risk job. The person who quotes is not always the person who turns up, and a few phone calls before you sign can save a lot of trouble.

How to avoid it: building work contractor licences in South Australia are issued by Consumer and Business Services. Check the licence on the CBS public register, and ask to see current insurance details before work starts. Ask who will be on site, who supervises, and whether any part of the job is subcontracted.

Roof Replacements Adelaide is a referral website. Work is done by independent local contractors, and we ask the contractors we work with to hold the licences and insurance the job needs. You should still check for yourself. Our list of questions to ask a roof replacement contractor is a useful script for those conversations.

Mistake 3: Ignoring what sits under the roofing

The tiles or sheets are only the visible part. Underneath are battens, rafters, sarking, insulation, ventilation and the gutters that carry water away. On older Adelaide houses, particularly those built from the 1950s to the 1980s, timber may have sagged, battens may be worn, and there may be no sarking at all. Reactive clay soils across much of the Adelaide Plains also move houses a little each year, which can show up as sagging lines or cracked cornices.

A new roof laid over tired framing can sit unevenly, leak at joins or make the existing problems harder to fix later.

How to avoid it: ask the contractor to inspect the roof space and tell you what they found. Ask whether the quote allows for batten or rafter repairs, and how any extra work will be priced. Treat a re-roof as a chance to add or upgrade insulation and sarking, which is much easier with the roof open. Our guides to roof insulation during replacement and sagging roofs cover these in more depth.

Mistake 4: Leaving asbestos, approvals and solar to the last minute

Three things regularly delay re-roofing jobs in Adelaide, and all of them can be sorted out early.

Asbestos. Many post-war houses, sheds, garages and eaves used asbestos cement sheeting, including corrugated Super Six profiles. Removal is licensed work regulated by SafeWork SA, and the waste must go to an EPA-licensed facility. SafeWork SA sets out when a licensed removalist is required, so check with them, and never cut, drill, water-blast or walk on the sheets yourself. If you are unsure what your roof is made of, read how to tell if your roof is asbestos.

Approvals. Like-for-like re-roofing often needs no development approval, but heritage places and areas, a change of roof shape or structural work can. Applications go through the PlanSA portal under the Planning and Design Code. In the Adelaide Hills and other areas covered by a bushfire hazard overlay, the new roof may need to meet AS 3959 construction requirements. Check with your council before work starts.

Solar. Panels have to come off and go back on. Book the solar installer early, agree who is responsible for each step, and keep a record of the system's condition before removal.

Mistake 5: Choosing a material or colour that does not suit the site

A roof that looks right in a showroom may not suit your house. Near the gulf coast, salt air affects which metal finishes are recommended. In the hottest parts of the plains, a very dark roof absorbs more heat. Some newer estates have covenants on roof colour, and heritage areas may expect a particular material or profile. Heavier tiles may not suit a frame designed for a lighter roof, and switching from tiles to metal changes how rain and wind sound inside.

How to avoid it: tell the contractor where you live, how close you are to the coast and what matters to you, whether that is heat, noise, looks or maintenance. Check estate and council rules, and look at real samples outdoors rather than on a screen. Our guide to the best roofing materials for the Adelaide climate compares the main options.

Red flags worth noticing

Some warning signs point toward one of the mistakes above before you have committed. Slow down if you notice any of these:

  • Pressure to sign on the spot. A discount that only applies if you agree today leaves no time to compare or check credentials.
  • Door-knocking after a storm. Hail and wind events bring out people offering quick roof work. Some are genuine; some are not. Get your own quotes and check licences before agreeing to anything.
  • A vague product description. 'Metal roof' or 'new tiles' without a named product, profile and colour makes it hard to know what you are paying for.
  • A large upfront payment. Ask how payments are staged against progress, and be wary of paying most of the job before materials arrive.
  • No mention of what lies beneath. A quote that never mentions battens, sarking or the roof space suggests nobody has looked.
  • Reluctance to show paperwork. A contractor who will not share a licence number or insurance details is a contractor to skip.

If you are not sure whether your roof needs replacing at all, our guide to leaking roof repair vs replacement can help you decide before you start collecting quotes.

Putting it together

None of these mistakes is unusual, and none is hard to avoid with a little preparation. Get comparable quotes, check the contractor's licence and insurance yourself, ask about the framing and underlay, deal with asbestos, approvals and solar early, and pick a material that suits your street and climate. When you are ready to get started, our re-roofing page explains how we connect Adelaide homeowners with local contractors.

Next step. Prices for Adelaide roofs are on the roof replacement cost guide, and the matching service is Re-roofing. To have a contractor look at your roof, call 08 7100 9699.

General information about roofs in and around Adelaide. It does not replace an inspection of your roof, and rules change: confirm anything regulatory with the council or agency named.

Common questions

Before you book: the usual questions

How many quotes should I get for a roof replacement?

Two or three detailed written quotes is usually enough to see a fair range and spot anything missing. More than that can make comparison harder rather than easier. Make sure each one describes the same scope so you are comparing like with like.

What should a roof replacement quote include?

It should name the roofing product and colour, say what happens to battens, sarking, insulation, gutters, downpipes and flashings, cover removal and disposal of the old roof, and explain how variations are handled. It should also note who looks after solar panels, scaffolding and any asbestos work.

Do I need council approval to replace my roof?

Often not, if you are replacing like for like. Heritage places and areas, changes to the roof shape and structural work can need development approval through the PlanSA portal. Check with your council before work starts, as the answer depends on your property.

Is it a mistake to change from tiles to metal?

Not in itself. Many Adelaide homes switch from tiles to Colorbond for lighter weight and fewer joints. It is worth confirming the roof frame, council rules and any estate covenants first, and thinking about noise, insulation and how the new roof will look on the street.

Can I stay in the house during a roof replacement?

Most people do. Expect noise, some dust and limited driveway access during working hours. Discuss with the contractor whether any part of the job, such as asbestos removal, means you should be out of the house for a period.

No-cost quotes

Talk to us about your job

Tell us what is going on and where. A local contractor will come back to you with a price.

Ring 08 7100 9699

Describe the roof and we will line up an inspection

Roof Replacements Adelaide Ring 08 7100 9699 Book a free roof inspection
Ring 08 7100 9699